D&M Contractors recently completed a carefully managed project at the Greene King Black Bull, involving the removal of a rotten external staircase and the installation of a new staircase constructed from high-quality decking, complete with handrails.
With several stages involved, our engineers worked closely with the client to ensure the finished result reflected their exact vision—while maintaining a safe and well-managed site throughout.
The project began with the area being securely barriered off, followed by the careful removal of the existing staircase. Timber posts were then installed and set in place, before fitting a new stair stringer and constructing the new decking staircase with handrails. The area was then finished with painting and final detailing.
All waste was removed from site, leaving the space clean, safe, and fully restored.
The D&M team were praised for their professionalism, workmanship, and commitment to delivering a result that met the expectations of the team at Greene King Black Bull.